There has been a lot of paving that has been completed over the past week and a half!!  Godberson Smith will be finished on site this week with the road paving.

Next the permeable paver contractor will be on site beginning Wednesday September 7th and will begin to place the permeable pavers.  At the same time as the permeable pavers will be placed the sidewalks and parking lot will begin to be poured and back filling behind the curbs will occur.

The highway 7 lane shift has been removed and traffic can now flow freely there, but Erie Street and the intersections with 6th Street and 7th Street will remain closed for the time being.